In Partnership with Dura ®

We have developed our UHPC mixes in close contact with the experts of the craft.

 

 

ABOUT DURA

With over 15 years of UHPC experience DURA has produced a product that not only competes with but out performs traditional construction materials. DURA strongly believes in the advancement of building materials to push the current limits and maximize potential. Today, DURA has earned the strong confidence of its clients and has made structural UHPC the norm in Malaysian bridge construction.

 

  • Reduce material use
  • Design durable structures
  • Minimize life cycle cost
  • Build what could not be built before

 

Leading UHPC Innovation in Malaysia 

Since 2008 Dura has worked on 186 UHPC bridge projects many of which would not have been implemented had it not been for the cost effectiveness or the spans achievable by this material. While other companieshave limited their UHPC use for joint work and repair Dura has realized the potential of UHPC and has made it the norm in Malaysian bridge construction.

 

 

Dura
Project Highlights 

Manong Bridge

5 span precast UHPC system post tensioned on site.

Sg Guntung Bridge

65 m long UHPC span cast as a single piece and transported to site.

Batu 6 Bridge

100 m long UHPC span consisted of 40 precast sections assembled on site. Earned the 2016 PCI design award.